日本中文一级网站,国产精品视频亚洲精品视频,日本精品免费在线视频,婷婷五月深爱憿情网综合,国产一级特黄AⅤ大片免费,国产农民嫖妓200视频

首頁
產(chǎn)品
卓越 ? 易用 ? 可靠
視頻
讓中國物聯(lián)網(wǎng)領(lǐng)先世界
搜索
歷史搜索
搜索發(fā)現(xiàn)
HOME > SERVICE > Problem

AC0606 voltage and current calibration

2022-06-11 15:49:35| Source:網(wǎng)絡(luò)| views:| 0

1. The power supply of the equipment is normal, the measured current passes through the transformer coil, and the municipal power is connected to the voltage acquisition port. 

2. The current is preferably about 80% of the measuring range of the transformer coil, and the load to be measured can also be used for calibration. 

3. After the equipment communication is connected, open the modbus poll project for calibration.

  

modbus poll工程進(jìn)行校準(zhǔn)


  

modbus poll工程進(jìn)行校準(zhǔn) 數(shù)據(jù)顯示

4. Use the instrument to measure the voltage of the voltage acquisition port and the current through the transformer, and fill in the [standard source] project. 

4. After filling in the standard source, wait for 5S after filling in the calibration mode [171], observe whether the values of each voltage, current and power channel are correct, and if correct, the calibration is completed.

修改后觀察電流、電壓、頻率等內(nèi)容

5. After the equipment is powered on again, adjust the current to observe the linearity of the equipment, if the power factor is less than 0.5 or negative reverse connection transformer.


聯(lián)系銷售
銷售王經(jīng)理微信 銷售王經(jīng)理
微信公眾號 微信公眾號
服務(wù)熱線
400-6688-400
二连浩特市| 博爱县| 桑日县| 老河口市| 资兴市| 乌鲁木齐市| 海晏县| 博客| 宝丰县| 康平县| 兴国县| 昌图县| 罗源县| 淳化县| 石渠县| 马鞍山市| 白银市| 华蓥市|